BEST provides test procedures and manages all test & commissioning levels as per International Data Centre Standards:
- Level 1 - Factory Acceptance Testing (FAT)
- Level 2 - Site Acceptance Inspection (SAT)
- Level 3 - Pre-functional Testing
- Level 4 - Functional Performance Testing
- Level 5 - Integrated System Testing (IST)
- White space is ready for IT